New construction carried out with the IsoHemp Hempro system. A post-and-beam construction system with concrete poured directly into the 30 cm hemp blocks.
An additional 20 cm thick envelope is created to achieve a passive house standard.
Architect: J. Goffin - Kiss Architects
Contractor: Julie Goffin
Year of completion: 2018