You are here
New building - semi-detached house - London
Construction of a semi-detached house in London with a metallic structure.
Construction of a 3-storey semi-detached house in the heart of London, using the Hempro system (36 cm hemp blocks) combined with a metallic structure. The house has a total structure of 240m². Application of a PCS natural interior coating to obtain a modern and ready-to-paint finish.
Architect: Cathie Curran
Contractor: Hub Construction Services
Year: 2021
©2023, IsoHemp - Natural Building